31
A can finish a work in 24 days, B in 9 days and C in 12 days. B and C start the work but are forced to leave after 3 days. The remaining work was done by A in?
(a) 5
(b) 6
(c) 10
(d) 11
Answer:

Option (c)

32
A certain number of men can complete a job in 30 days. If there were 5 men more, it could be completed in 10 days less. How many men were in the beginning?
(a) 10
(b) 15
(c) 20
(d) 25
Answer:

Option (a)

33
A is thrice as good a workman as B and so takes 60 days less than B for doing a job. The time in which they can do the job together is?
(a) 22
(b) 30
(c) 45
(d) 60
Answer:

Option (a)

34
A man can do a piece of work in 5 days, but with the help of his son, he can do the same work in 3 days. In what time can the son do it alone?
(a) 13-Feb
(b) 7
(c) 15-Feb
(d) 8
Answer:

Option (c)

35
A, B and C can do a piece of work in 11 days, 20 days and 55 days respectively, working alone. How soon can the work be done if A is assisted by B and C on alternate days?
(a) 7
(b) 8
(c) 9
(d) 10
Answer:

Option (b)

36
A, B and C can do a piece of work in 20, 30, and 60 days respectively. In how many days can A do the work if he is assisted by B and C on every third day?
(a) 12
(b) 15
(c) 16
(d) 18
Answer:

Option (b)

37
If 5 men or 9 women can do a piece of work in 19 days. In how many days will 3 men and 6 women do the same work?
(a) 10
(b) 12
(c) 13
(d) 15
Answer:

Option (d)

38
If 8 men, working 9 hours per day can build a wall 18 meters long, 2 meters wide and 12 meters high in 10 days. How many men will be required to build a wall 32 meters long, 3 meters wide and 9 meters high by working 6 hours a day in 8 days?
(a) 25
(b) 18
(c) 30
(d) 16
Answer:

Option (c)

39
Kim can do a work in 3 days while David can do the same work in 2 days. Both of them finish the work together and get Rs.150. What is the share of Kim?
(a) Rs.30
(b) Rs.60
(c) Rs.70
(d) Rs.75
Answer:

Option (b)

40
X can do piece of work in 40 days. He works at it for 8 days and then Y finished it in 16 days. How long will they together take to complete the work?
(a) 13
(b) 15
(c) 20
(d) 56
Answer:

Option (a)